Customer Background: This enterprise focuses on sewage treatment business and needs sewage pumps that can operate stably for a long time to ensure the smooth operation of the wastewater treatment process.
Customer Needs: Since the sewage contains a large amount of impurities, the original pump equipment is frequently blocked, resulting in unstable operation and affecting the overall treatment efficiency.
Solutions: We recommended a large-channel non-clogging self-priming pump and optimized the pipeline design to ensure that the sewage can be discharged smoothly and reduce the equipment maintenance requirements.
Cooperation Achievements: After the renovation, the pump blockage situation was reduced by 80%, the equipment maintenance cost was reduced, and the overall sewage treatment capacity was improved. The customer recognizes the stability and efficiency of the new equipment.